Construction as of Sept 12, 2009
Air conditioning ducts being installed inside transmitter building
AC units being tested by using a 480 volt generator. 480 Volts will be installed by the utility co. shortly.
Elbow carrying RF from the final tube to the harmonic filter.
Balun matching devise being connected to the transmission line window to carry RF to the antenna.
Transmission line window outside the building.
George installing the final tube.